Outpatients building burst pipe and flooding

Official information request details

  1. Correspondence between the CDHB and Leighs Construction staff about the incident, including any discussion about liability and repair costs.
  2. Correspondence between the Ministry of Health and the CDHB about the incidence, including any discussion about liability and repair costs.
  3. Internal CDHB correspondence about the failure.
  4. Any reviews or incident reporting related to the failure.

For the correspondence, please provide any information from Friday 29 March to April 2.

Tags

Download (pdf, 400KB)

Back to Document Library

Page last updated: 8 May 2019

Is this page useful?