Seismic/Building report done on Princess Margaret Hospital / Main Building
Any DHB seismic reports 2018. EQ prone buildings 2018. Non-structural seismic restraints provided by DHBs.
The most recent detailed seismic assessments for Burwood Campus except the new building.
The most recent Detailed Engineering Evaluation (DEE) of the Riverside, Parkside buildings at Christchurch Hospital
Showing 1-4 of 4 results, page 1 of 1.
Page last updated: 15 September 2021
Is this page useful?