Christchurch Hospital Hagley

Christchurch Hospital Hagley – Public Open Day on Sunday 6 October 2019

Early next year, Christchurch Hospital Hagley will become home to many of Christchurch Hospital’s acute services. Hundreds of patients and more than 3000 staff will make the move to the new building, including the Emergency Department, Intensive Care, some radiology services, operating theatres and a number of wards.

Before all that happens, you have a chance to get a sneak peek into the newest part of our hospital.

On Sunday October 6, doors will open at 10am for an early look at the newest part of Christchurch Hospital.

You’re invited to come along and see the new Emergency Department, Radiology, Intensive Care and a surgical ward.

  • Please wear soft-soled shoes, and allow around 30 minutes for the tour itself.
  • We anticipate a lot of people will be keen to come and take a look around, so there might be a bit of waiting time beforehand. There’ll be lots to see and do, so keep an eye on the Canterbury DHB Facebook page where we’ll post estimated queue times and updates on the day.
  • Last entry will be at 3pm.
  • Entry is free but a gold coin donation for the Māia Health Foundation is appreciated.

For up to date news about all of our facilities projects just look for Facilities Fast Facts in each issue of our weekly CEO Update publication.

With a building footprint of 10,450m2, the new Christchurch Hospital Hagley (Hagley) will be the South Island’s largest hospital building. It has been built to IL4 (Importance Level 4) standards, or 180% of code – the highest level for a building designated to an essential facility that needs to be up and running after a disaster. The building is fitted with 129 base-isolators.

Other features include:

  • 62,000 m2 total area
  • 13 lifts in the building
  • Built with steel framing (6,000 tonnes of structural steel and over 100,000 bolts) with a curtain wall made up of 1,300 panels.
  • Lots of natural light.
  • Significant seismic protection in the building – apart from the base isolators there is lots of seismic bracing, gaps in the stairs to allow movement and special joints in the pipes that run services such as hot water, steam and air conditioning.
  • Tower A (Level 3 – 9) – General Surgery wards, Vascular, Stroke, Children’s medical, Children’s Haematology and Oncology Centre (CHOC) and the helipad.
  • Tower B (Level 3 – 8) – Neurology and Neuro Surgery, Children’s Surgery, Bone Marrow Transplant Unit and Adolescent and Young Adult Cancer support, Oncology, Orthopedics and General Surgery.
  • Level 2 – Sterile Services and administration areas
  • Level 1 – Intensive Care, Theatres and Radiology
  • Ground Floor – Emergency Department, Medical Assessment, Acute Care and Radiology
  • The Lower Ground Floor has meeting rooms, shared work spaces and changing rooms for staff

Project consultants

The consultants involved in the project are:

  • Architects – Katoa Health Design including Chow Hill, Warren and Mahoney and Thinc Health
  • Quantity Surveyors – Rider Levett Bucknan
  • Project Programmers – Woods Harris Consulting
  • Structural, Geotech and Civil Engineers – Holmes Consulting
  • Mechanical and Electrical Engineers, 
  • Communications, Security, MTAV services – Beca
  • Fire Engineering and Fire Protection Design – Aurecon 

Which services will be going into Hagley?

Hagley will be the home for many of Christchurch Hospital’s Acute Services – things like the Emergency Department, some radiology services, and Medical Assessment for people who are acutely unwell – and the towers will house many of our acute wards: general surgery, orthopaedics, oncology, Children’s Health.

Will wards/departments keep the same names they have now?

All ward/department names will change in the new building, aligning Christchurch Hospital with international best practice. The new ward/department names will clearly identify where the ward/department can be found in the new building – for example, Children’s A7 is the Children’s ward in Tower A, Level 7. If you’re visiting a patient in one of the wards/ department that are moving, you’ll know in plenty of time exactly where they’re going and what the new ward/ department will be called.

OLD NAME

NEW NAME & LOCATION

 

Ward A8         

Ward 28

Ward B8

Ward 22

Children’s A7

Ward 21

Children’s B7

CHOC

CHOC A6 (Children’s Haematology and Oncology Centre)

BMTU and AYA

Ward B6         

Ward 17

Ward A5         

Ward 26

Ward B5         

Ward 19

Ward A4         

Ward 18

Ward B4         

Ward 15

Ward A3         

Ward 16

Ward B3

Sterile Services

(Level 2)

Sterile Services

Intensive Care Unit (ICU), Surgery, Radiology

(Level 1)

Intensive Care, Children’s High Care, Interventional Radiology

Emergency Department,  Children’s Emergency / Acute Medical Assessment Unit

(Ground Floor)

Emergency, Monitored Observation, Acute Care, Children’s Emergency Care, Medical Assessment, Main Radiology         

Christchurch Hospital Hagley Services and Floors Listing

When will Hagley open?

Radiology will begin seeing patients in the new building in November 2019, with Sterile Services moving in early December.

The majority of services will move late January/early February 2020.

MOVE DAYS 2020

MONDAY JANUARY 27

Bone Marrow Transplant Unit (BMTU) and Adolescent and Young Adult Cancer Services (AYA) to B6

9.30am start

Open for visitors from midday

Ward 26 to B5

1.30pm start

Open from 4pm

TUESDAY JANUARY 28

Intensive Care Unit to Level 1

6am start

Open from 8am

WEDNESDAY JANUARY 29

Emergency Department to Ground Floor

5am start

Open from 6am

Medical Assessment to Ground Floor

1.30pm start

Open from 3pm

THURSDAY JANUARY 30

Ward 21 to B7

9.30am start

Open from midday

Children’s Haematology Oncology Centre (CHOC) to CHOC A6

Following Ward 21

Open from midday

Paediatric High Dependency Unit (PHDU) to Children’s High Care Ground Floor

1.30m start

Open from 4pm

Ward 22 to Children’s A7

Following PHDU

Open from 4pm

FRIDAY JANUARY 31

Ward 16 to B3

9.30am start

Open from midday

Ward 15 to A3

1.30pm start

Open from 4pm

MONDAY FEBRUARY 3

Ward 17 to A5

9.30am start

Open from midday

Ward 28 to B8

1.30pm start

Open from 4pm

TUESDAY FEBRUARY 4

Ward 19 to A4

9.30am start

Open from midday

Ward 18 to B4

1.30pm start

Open from 4pm

How many patients will be moved?

Over a period of about two weeks, as many as 350 patients will be moved to Hagley, depending on how many are in each ward/department on the day of the scheduled move. As you can imagine, the planning for this move has been extensive, and there is a very tight schedule to make sure everyone is moved safely and as quickly as possible.

If I have a friend of family member in the ward on the day of the move, will I need to be there?

Most patients won’t need any help being moved to the new building – we transfer patients between wards and departments all the time, and it won’t be a lot different. However, if your family member would be more comfortable with you there, we may ask you to be on hand during the move. We’ll be handing out lots of information and there’ll be plenty of signage, but if you have any questions, please speak to the Charge Nurse on the ward/department beforehand.

How many staff are moving to Hagley?

Around 3000 staff will move to Hagley from their existing wards and departments.

Will there be extra parking?

Visitors to Christchurch Hospital should continue to make use of the free Park and Ride facilities at the Lichfield Street car park (the ride is free, but you still need to pay for your parking) The free shuttle will continue to drop people at the front entrance of Christchurch Hospital and patients and visitors can make their way to Hagley via the new link corridor. The walk is all undercover and signposted. There will be limited emergency drop off and pickup parking in front of the new building and some time-restricted mobility parking, but there will be no additional long-term parking available at the hospital.

Where will I go for Emergency assistance?

As always, if you have an emergency, you should call 111 for an ambulance. The new hospital Emergency Department (ED) will be located on the ground floor of Hagley. If you are being driven to ED, you’ll be able to come into the main entrance off Riccarton Avenue to the emergency drop off area outside Hagley, just to the left of Christchurch Women’s Hospital. This will be a drop-off and pick-up zone only with limited time-restricted parking. This is also where ambulances will drop off to.

Where do I go to visit someone at Hagley?

You will be able to get to Hagley from the main entrance of the Christchurch Hospital and through the link walkway on the ground floor. Hagley also has its own entrance from the drop-off zone, beside the Emergency Department entrance.  There is an information desk in the ground floor entrance lobby.

What’s happening with all the old spaces?

There will be movements of other wards from around the hospital into vacated spaces to make way for future development.

Was the public consulted on the project?

Yes. Extensive consultation occurred in 2010 jointly between the CDHB and the Christchurch City Council, including public notices, stakeholder engagement, several public meetings and a full public submissions process. Feedback was very positive, with 233 of 248 submissions in support of the proposals.

Who designed the building?

A team of internationally renowned health-sector architects and health planners has worked on the designs. Canterbury DHB clinical and ancillary staff, other health providers, hospital suppliers and service providers, patient groups and some members of the public have also been involved in the design process.

How do I find out more?

Keep an eye on this website for updates or send an email to itsallhappening@cdhb.health.nz and one of the project team will respond. 

Timelapse video

Page last updated: 17 September 2019

Is this page useful?