Health system

1 document.

Canterbury DHB Transition Plan 2012

The Transition Plan maps the course of this transition out of the damage caused by the earthquakes and into our future vision for a connected health system that puts the patient at the centre.

Tags

More informationDownload pdf

Showing 1-1 of 1 results, page 1 of 1.

Page last updated: 25 October 2018

Is this page useful?