Ashburton Hospital Redevelopment Project

Response to official information request

  1. When was the newly refurbished operating theatre at Ashburton Hospital opened? (The Ashburton Hospital Redevelopment Project).
  2. What was the final cost of the refurbishment project?
  3. What part of that budget was spent on the operating theatre?
  4. How many surgeries / procedures was it designed to carry out?
  5. What was the purpose of the operating theatre?
  6. How many surgeries / procedures have been carried out since then?
  7. What sort of surgeries / procedures were these?
  8. Where are surgeons and staff for this sourced from? (e.g. are they local or brought in from another area?)

Tags

Download (pdf, 800KB)

Back to Document Library

Page last updated: 29 August 2019

Is this page useful?